Millwork Shop Drawings That Move Straight From Approval to Fabrication

Every round of RFIs on a millwork package costs time nobody budgeted for. The shop stops, the GC waits, and the schedule slips — usually because a dimension didn’t reconcile with the architectural set, or a detail the fabricator needed simply wasn’t drawn. Getting millwork shop drawings right the first time is less about drafting […]